Office renovation and office design in Costa Rica

Office renovation

Office renovation and office design in Costa Rica

LDB Arquitectura designs corporate offices in Costa Rica, from renovating offices in use and expanding onto a new floor to designing offices in the new space a company leases or buys. What already exists is the starting point. Together with your company we assess what is worth keeping, adapting or replacing in the structure, facades and building systems. The design focuses on the areas where the use changes.

Evertec Costa Rica offices, open work area next to a glass meeting room, Tournón, Goicoechea
A project by LDB Arquitectura. Evertec Tournón, Tournón, Goicoechea, 2022. View the project →

What an office renovation solves

In the preliminary study we review with your team how people work today and how they will work in the coming years. From there we resolve

  • The layout of workstations, meeting rooms, support areas and the cafeteria, based on how each department really works
  • Daylight and circulation, so corridors lead to the facade and not to a wall
  • The electrical, data and air conditioning systems the new layout requires
  • Universal accessibility at entrances, restrooms and circulation routes
  • Future growth, with zones that can change use without major construction
  • The construction cost, estimated from the schematic design and refined at every stage

Expand

When the space is no longer enough, the expansion can be an additional floor, a new volume next to the existing building or an annex on the same site, depending on what the current structure allows.

Optimize

With remote and hybrid work, many companies need to do more with less space. Areas are compacted and consolidated, floors are released or handed back, work is reorganized into fewer square meters and assigned desks become shared areas.

How we work while the office stays open

Most renovations happen without the company stopping. That is why the construction process is designed too. Logistics are planned so several phases can run at the same time, with sealed-off and protected work zones, hours agreed with building management, separate material routes and protection for everything that stays in use.

Zone AZone BZone CPhase 1Under works, sealed offProtectedIn usePhase 2In useUnder works, sealed offProtectedPhase 3In useProtectedUnder works, sealed offUnder works, sealed offProtected, next to the worksIn useSeparate material routesand noisy-work hoursaway from operationsZone AZone BZone CPhase 1Under worksProtectedIn usePhase 2In useUnder worksProtectedPhase 3In useProtectedUnder worksUnder works, sealed offProtected, next to the worksIn useMaterial routes and noisy-work hourskept apart from operations
Illustrative diagram of phased works. The number of zones and phases is set in the schematic design.

Survey without interruptions

We measure the space at times agreed with building management.

Phased plan

The renovation is split into interventions with start and end dates, each one listing the areas that are vacated and the ones that keep working.

Sealed-off, protected zones

Each work zone is closed off against dust and noise, with its own material route and protection for floors, equipment and furniture still in use.

Temporary relocations

We define where each department moves while its area is under construction.

Noise and dust after hours

Demolition, cutting and finishes with strong odors are scheduled at night or on weekends when operations require it.

Coordination with the building

In a condominium or a leased space, the design follows the building rules and its permitted work hours.

Stages and what you receive at each one

1234 Preliminary studySurvey andfirst cost range Schematic designLayout, estimateand phasing plan Construction documentsDetailed budgetand permits Construction oversightSite visitsthrough handover Phased construction PhasePhasePhase The office stays open Temporary relocations and noisy work after hours 1234 Preliminary studySurvey and first cost range Schematic designLayout, estimate and phasing plan Construction documentsDetailed budget and permits Construction oversightSite visits through handover Phased construction PhasePhasePhase The office stays open Temporary relocations and noisywork after hours
Illustrative diagram. The number of phases is set in the schematic design.

Stage 1

Preliminary study

Survey of the existing space, area program by department, assessment of what can be kept and a first cost range.

Stage 2

Schematic design

Area layout, images of the space, cost estimate and a phasing plan for construction with the office in operation.

Stage 3

Construction documents

Coordinated architecture and engineering drawings, technical specifications, a line-item budget for contractor bids and permit management with the municipality and the relevant institutions.

Stage 4

Construction oversight

Site visits, review of progress and quality, and support for the client through to handover.

Timelines depend on the floor area, the phases and the permits, and are set out in our quote.

Selected LDB projects

See more corporate, retail and hospitality work on Architects in Costa Rica for offices, retail and hotels or browse the corporate and commercial portfolio.

Office renovation FAQ

Can the office be renovated without stopping operations?

Yes. Construction is divided into phases and each phase vacates only part of the floor. The noisiest and dustiest work is scheduled outside business hours when needed.

Does an office renovation in Costa Rica need a building permit?

In most cases it does, especially when partitions, electrical or mechanical systems or emergency exits change. In the preliminary study we review which permits apply to your project and include them in the work plan.

How much does it cost to renovate an office?

It depends on the floor area, what is kept and the level of finishes. LDB provides a first cost range in the preliminary study, a cost estimate in the schematic design and a line-item budget with the construction documents. For a first reference you can use our construction cost calculator.

Is it better to renovate or to move to another building?

It depends on what the current building allows. We compare both options with the area, cost and timeline of each one before you decide.

Does LDB work in leased offices or condominiums?

Yes. The design follows the building rules and what the lease allows. We coordinate construction hours and the reviews the building requires with its management.

Can the expansion be built on top of the same building?

Sometimes. We review the existing structure with the structural engineer before proposing an additional floor or volume. If the building does not allow it, we study an annex on the same site.

Tell us about your project

Tell us where the office is, how many people work there today, how many you expect and whether operations will continue during construction. With that we prepare a quote.